Equipment No. . |
|
Manufacturer . |
|
Description . |
|
Manufactured . |
|
Drawings . |
|
Photos . |
|
|
 |
 |
|
Specifications
|
|
|
Power station with 2 blocks x 150 MW
MINT CONDITION
New installed 1960 -61.
1993-95 Major Revision and Environmental cleanup
Environmental Conditions
Sulphur 25 mg S/MJ
Nitrogen oxides 50 mg NO2/MJ
Each Block 150 MW: Total running hours,
Block 1: approximate 43 630 hours.
Block2: approximate 41 923 hours
Total Number of starts
Each approximate block 1: 753 starts.
Block 2: 672 starts
Thermal Efficiency 38 %
Steam Generator makes SMW Sweden, Horizontal design, natural circulation
|
|